WMATA and the District Department of Transportation (DDOT) will hold an open house on the proposed Gold Line bus rapid transit (BRT) project Monday, Nov. 30, from 6 to 8 p.m. at the Atlas Performing Arts Center (1333 H St. NE). Residents can review proposed station locations and street layouts for H Street and Benning Road NE, ask questions and share their priorities.
The meeting is an opportunity to weigh in before Metro selects a preferred concept, expected in early 2027. For neighbors who watched the streetcar arrive after years of construction, then disappear after a decade of service, there is plenty to ask about what comes next.
Beyond Game Day
The Gold Line is framed as an upgrade to existing D20 and D2X bus service with dedicated center-running lanes, priority at traffic signals, near-level boarding and boarding through all doors. Its connection between Union Station and RFK is intended to give stadium visitors another route from the Red Line and regional rail, easing pressure on Stadium-Armory.
Metro says the project would also improve everyday travel for people going to work, school, stores and appointments. Its September fact sheet identifies 16,000 daily customers who could benefit.
The question for residents is how decisions about stops, service and street access will serve the daily needs of riders alongside the demands of stadium crowds —and how construction will affect access to H Street businesses for customers, employees and deliveries.
Lessons From the Streetcar
The DC Streetcar stopped operating March 31,2026, ending free service between Union Station and Oklahoma Avenue NE. DDOT directed riders toward alternatives such as the D20 bus, while planning continued for the corridor’s next transit investment.
On the streetcar’s final day, riders described both its usefulness and its limitations. Accessible boarding made it valuable to passengers with limited mobility, but double-parked vehicles could trap the cars in traffic. The wider network once envisioned by District leaders never materialized.
Dedicated bus lanes could address the problem of getting stuck behind traffic. But residents might have questions about enforcement, how passengers will safely reach center stations and whether the stops will serve older residents, people with disabilities and customers making short trips to neighborhood businesses.
Residents may want guarantees about service and stop frequency on regular days versus game days. Those details will determine whether the Gold Line makes daily travel easier for neighborhood riders and whether it will have a positive impact on the Atlas neighborhood overall.
For RFK, H, or Both?
Planning around the Gold Line is not tied to the needs of H Street. Instead, it is directly linked to the new stadium opening at the former RFK Campus. Construction is projected to begin in summer 2028 and finish in spring 2030 with service beginning that summer. But funding has not been allocated for final design and construction.
It’s a big ask in a period where the District economy is under strain. Keeping the Gold Line on schedule for a 2030 opening will require the District to secure final design and construction funding by spring 2027, according to Metro’s project timeline.
H Street businesses face a more immediate concern: getting through construction. The project is kicking off even as the Office of Planning (OP) looks at a new Small Area Plan for H Street NE. At a June planning session, residents and business owners questioned whether land-use planning was advancing without enough clarity about transit. The draft plan described substantial storefront vacancies and an uneven recovery, particularly along the corridor’s eastern end.
Metro says center-running lanes can preserve curb space for deliveries, pickups, drop-offs and parking while improving customer and employee access. Businesses have concerns about how that works on their blocks, including where trucks will unload, where vehicles can park and how customers will reach storefronts during construction.
Engagement
It’s DDOT and WMATA’s second RFK-related transit open house. At the first, on Aug. 25, the agencies discussed transit on the campus as well as presenting the concept of the Gold Line.
This November meeting is focused on the Gold Line. It’s a chance to ask for construction phasing, accessible pedestrian routes and advance notice of changes affecting businesses.
Residents and business owners in the Atlas District are likely to come equipped with many questions and concerns. Public engagement is planned through the end of 2026.
Residents can register for the Nov. 30 session through Metro’s event page and learn more at wmata.com/goldline.








